Field set-up checklists – Great Plains NP4000 40-foot Operator Manual User Manual
Page 53

Great Plains Manufacturing, Inc.
Operating Instructions
49
2012-03-28
407-776M
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/fertilizer applicator configuration. Additional
or fewer steps may be necessary depending on tractor
features, fertilizer applicator options and planting
accessories.
Mechanical Checklist (Tractor Hitching)
Page
Fertilizer Applicator hitched
Parking Stands stowed
Electrical Checklist
Page
Verify electrical hookups solid
Turn optional console POWER switch to
ON. Check console and observe any
diagnostic messages
a
a. Refer to console manual.
Hydraulic System Checklist
Page
Check tractor hydraulic reservoir full
-
Make hydraulic connections
Inspect connections for leaks
-
Row Units Checklist
Page
Check row cleaner setup (Option)
Check tubing connections to applicators
-
Check outlet behind arms
-
Check coulter blade condition
-
Check coulter depth
Mechanical Checklist (post-Hitching)
Page
Remove wing lock pins
Fully raise implement
Unfold wings
Install outer wing locks
Remove lift-assist locks
Install spacers
Check front-to-rear level
Check side-to-side level
Set application height
Plumbing System Checklist
(Prior to Tank Connection)
Page
Orifice plate size matches rate
Fittings all secure
-
Relief valve adjusted
Pump rate set
Strainer recently cleaned
Inlet shut-off valve closed
14
Mechanical Checklist (Cart Hitching)
Page
Nurse tank hitched
Hitch pin locked
Safety chains secured
Plumbing Checklist
Page
Tank(s) loaded
-
Supply hose shut-off valve closed
14
Discharge valve(s) open to pump
14
Vent (if any) open
14
Tank hose(s) routed to implement
connectors, mated and locked
19
Hose slack adjusted.
19
Unused hoses secured
-