beautypg.com

Hydraulic charge and bleed, Lift hydraulics, Cylinder hydraulics – Great Plains YP1220 Operator Manual User Manual

Page 21: Leveling frame side-to-side, Lift hydraulics cylinder hydraulics

background image

Great Plains Manufacturing, Inc.

Preparation and Setup

17

03/14/2012

401-506M

Hydraulic Charge and Bleed

Normally the hydraulic system is fully charged and bled
at the factory before shipping. If repairs have been made,
substantial amount

s of oil drained from the system, or the following proce-
dures do not correct a problem, see “Bleeding Hydrau-
lics
” on page 55.

Lift Hydraulics

Bleeding should not be required other than to raise fully
and hold lever on for one minute or until all cylinders
extend fully. If this does

Cylinder Hydraulics

Bleeding should not be required other than to fold fully
and hold lever on for one minute or until all cylinders
reach the end of their stroke.

Planter Damage Risk:
Do not fold or unfold without first raising planter completely.

Leveling Frame Side-to-Side

All frame sections must be level to maintain even plant-
ing depth. Before using the planter in the field, follow
these steps to make sure the planter is level side-to-side.

Periodic frame-leveling adjustments should not be nec-
essary, but if you are having problems with uneven
depth, check planter levelness and follow these proce-
dures.

Before making any adjustments be sure the lift cylinders
are re-phased and operating properly.

Complete the steps under “Hydraulic Charge and
Bleed
” on page 17, bef
ore proceeding.

Note: Level frame in planting conditions. Failure to do so

may result in machinery not producing desired re-
sults.

Refer to Figure 9
1.

Unfold the planter fully and set down. Put in field
position by lowering and pulling forward.

Figure 9

Base Height

27457