Hydraulic charge, Drill level, Hitch air cart – Great Plains 3N4010HDA Operator Manual User Manual
Page 23: Connect seed hoses

Great Plains Manufacturing, Inc.
Preparation and Setup
19
2013-09-24
196-444M
Hydraulic Charge
The hydraulic system was fully charged and bled when
the drill left the factory. If any changes were made prior to
delivery (such as installing markers), or there is any
question about the status of the system, see “Bleeding
Hydraulics” on page 54.
After some use, it is normal for the lift cylinders to get out
of phase. If one or more sections are not fully lifting, or
are lifting to different heights, see “Re-phasing Lift
System” on page 24.
Drill Level
A new drill has been aligned at the factory and should
not require adjustment prior to first use. Level needs to
be checked periodically, and possibly adjusted.
See “Leveling Drill” on page 56
• “Side-to-Side Level” on page 56
• “Front-to-Back Level” on page 57
• “Section Alignment” on page 58
Hitch Air Cart
Consult the air cart Operator manual for detailed
instructions on hitching. Secure pintle hitch before
making seed hose connections.
Connect Seed Hoses
Refer to Figure 11
Inspect the gasket on the cart side of the bulkhead and
replace if not intact.
Making sure that neither hose bundle is rotated, mate the
air cart and drill main seed tube bulkheads.
Secure them with the latches.
Make electrical and hydraulic connections at bulkhead.
Attach safety chain.
Figure 11
Cart-Drill Bulkheads
27082