beautypg.com

Foot spraying – Great Plains TSF1290 Operator Manual User Manual

Page 55

background image

Great Plains Manufacturing, Inc.

Operations

51

05/10/2012

500-641M

60-Foot Spraying

The TSF sprayer is capable of spraying at 60 feet as well
as 80/90 feet. The conversion may be done starting from
a folded configuration, or with booms unfolded.

Refer to Figure 44 (depicting right boom fully unfolded)
The outer boom has an inner section

(the “60 foot”

boom) and an outer section

(the “80 foot” or “90 foot”

boom). The 80/90 section can be folded back, while leav-
ing the 60 foot section extended.

Conversion to 60-Foot, from Folded
1.

Raise left and right Tilt to uppermost position.

2.

Unfold left and right inner booms

90˚.

3.

Lower elevation to a position where the end of the
boom is easily accessible.

4.

Remove the pin

interconnecting the 60ft and 80/

90ft boom sections.

5.

Manually swing the 60 ft boom section

out 180˚

until it seats in the snaps

.

6.

Replace pin

in the 80/90ft section for storage.

7.

Unhook cable

from the ring on the lock plunger,

and hook the cable to the stationary ring on the weld-
ment. This keeps the 80/90ft section

locked to the

inner boom

.

8.

Turn off sprayer boom sections 1 and 5.

Conversion to 60-Foot, from Unfolded

1.

Remove the pin

interconnecting the 60ft

and

80/90ft

boom sections.

2.

Hydraulically fold the inner section

of outer boom

180˚.

3.

Replace pin

in the 80/90ft section for storage.

4.

Unhook cable

from lock plunger ring, and hook it

to the stationary ring on the weldment. This keeps
the 80/90ft section

locked to the inner boom

.

5.

Turn off sprayer boom sections 1 and 5.

Re-conversion to Full Width

1.

Remove pin

from storage in the 80/90ft section.

2.

Unhook the lock cable

from welded ring and hook

to plunger ring.

3.

Fold 60ft

boom and replace pin

to tie outer

boom sections together.

While converted to 60-foot operation, do not attempt to unfold
the outer boom sections with the hydraulics, or machine dam-
age will occur.

Figure 44

60ft Boom Operations

27298

2

3

1

4

7

6

5

2

3

1

4

2

5

4

6

3

1

4

2

3

2

4

6

3

1

4

6

2

4

This manual is related to the following products: