Inducting chemicals (option) – Great Plains TSF1290 Operator Manual User Manual
Page 51
Great Plains Manufacturing, Inc.
Operations
47
05/10/2012
500-641M
Inducting Chemicals (Option)
Always turn pump on before opening inductor shutoff valve (at
step 14). Always turn pump off after closing inductor shutoff
valve (at step 19). If the pump is not running, the tank can
drain back through the inductor. The inductor lid is vented,
and cannot prevent overflow.
Refer to Figure 28 on page 40
9.
Check that the
inductor-outlet/tank-inlet valve
is open.
Refer to Figure 37 and Figure 38
10. At the inductor, set valves:
to OFF and
(product valve) from OFF to INDUCT.
11. At the valve panel, set valves:
to AGITATE,
to MAIN TANK, and
to SPRAY.
12. Be sure the valve to the tank is open. Start the pump.
Note: The pump recirculates tank contents through a
venturi beneath the inductor tank.
13. Open the inductor lid.
Note: The inductor lid is vented, and the inductor may be
operated with the lid on or off.
14. Open the inductor shutoff valve
and inspect to
ensure that there is no back-flow of water from the
tank into the inductor.
15. Add the chemical to the inductor tank.
16. When the required amount of chemical has been
added, and the inductor tank is empty, close the
inductor shutoff valve
.
5
4
Figure 37
Panel for Induction
27275
3
2
1
1
2
3
5
5