Appendix b - initial and option setup, Post-delivery checklist, Seed monitor console installation – Great Plains 3PYPA Operator Manual User Manual
Page 163
03/20/2012
401-647M
Great Plains Manufacturing, Inc.
159
Appendix B - Initial and Option Setup
This Appendix covers setup tasks performed only once,
or at infrequent intervals. Routine setup tasks are cov-
ered in “Preparation and Setup” on page 13. Perform
Appendix B tasks first. Some of these items may already
have been done by your Great Plains dealer.
Post-Delivery Checklist
1.
Make sure the tractor is compatible (see list below).
2.
Read and understand “Important Safety Informa-
tion” on page 1.
3.
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
4.
Check that all grease fittings are in place and lubri-
cated. See “Lubrication” on page 124.
5.
Check that all safety decals and reflectors are cor-
rectly located and legible. Replace if damaged. See
“Safety Decals” on page 5.
6.
Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Tire Inflation Chart”
on page 139.
Seed Monitor Console Installation
The planter’s standard seed monitor system includes a
virtual terminal and switch panel that must be mounted in
the tractor cab. As supplied by DICKEY-john
®
, the kit
includes a flat bracket for the modules, and a ball swivel
for mounting the bracket in the tractor.
Transport and Field Safety Risk:
Mount the modules so that they are easy to monitor during
planting, but do not interfere with safe operation of the tractor
in the field or on public roads.
The ball swivel includes four 10-32 screws. You or your
dealer must provide the mounting holes for the screws.
Your dealer may have alternate suction cup or clamping
brackets available if you prefer to avoid drilling holes.
Refer to the included DICKEY-john
®
manual for harness
connections.
Null4:
Figure 155
Terminal and Switch Panel
26303