Great Plains 3PYPA Operator Manual User Manual
Operator manual, Manufacturing, inc, Point 40ft yield-pro
Manufacturing, Inc.
© Copyright 2012
Printed 03/20/2012
401-647M
Null4:
EN
Operator Manual
3PYPA
3-Point 40ft Yield-Pro
®
Planter
with Air-Pro
®
Seed Meters
Read the operator manual entirely. When you see this symbol, the
subsequent instructions and warnings are serious - follow without
exception. Your life and the lives of others depend on it!
Illustrations may show optional equipment not supplied with standard unit,
or may show prior 3PYP models and their options.
Null4:
29852
Table of contents
Document Outline
- Operator Manual
- Table of Contents
- Important Safety Information
- Look for Safety Symbol
- Be Aware of Signal Words
- Prepare for Emergencies
- Be Familiar with Safety Decals
- Wear Protective Equipment
- Avoid High Pressure Fluids
- Handle Chemicals Properly
- Keep Riders Off Machinery
- Tire Safety
- Use Safety Lights and Devices
- Transport Machinery Safely
- Shutdown and Storage
- Practice Safe Maintenance
- Safety At All Times
- Safety Decals
- Safety Reflectors and Decals
- 818-055C Slow Moving Vehicle Reflector
- 838-266C Red Reflectors
- 838-265C Amber Reflectors
- 838-267C Daytime Reflectors
- 818-557C Danger (in Spanish)
- 818-590C Danger: Crushing Hazard
- 838-599C Danger: Electrocution Hazard
- 818-045C Warning: Pinch/Crush
- 818-188C Warning: Speed
- 818-339C Warning: High Pressure Fluid Hazard
- 818-579C Warning: Pinch/Shear Hazard
- 818-580C Warning: Overhead Hazard
- 818-860C Warning: Moving Parts
- 818-078C Caution: Read Operator’s Manual
- 818-398C Caution: Tires Not A Step
- Introduction
- Preparation and Setup
- Operating Instructions
- Pre-Start Checklist
- Monitor Operation
- Raising/Lowering Planter
- Folding the 3PYPA Planter
- Lift Assist Cylinder Lock-Up
- Steering
- Transport
- Unfolding the 3PYPA Planter
- Walkboard and Ladder Operations
- Loading Materials
- Dismounting a Seed Container
- Fertilizer Operation (Option)
- Air System Operation
- Electric Clutch Operation
- Air-Pro® Meter Operation
- Marker Operation (Option)
- Field Set-Up Checklists
- Field Operation
- Short-Term Parking
- Long-Term Storage
- Adjustments
- Setting Material Rates
- Hitch Shims
- Height Switch Adjustment
- Gauge Wheel Adjustments
- Hydraulic Down Pressure
- Marker Adjustments (Option)
- Fan and Adjustment
- Liquid Fertilizer Adjustments (Option)
- 25 Series Row Unit Adjustments
- Troubleshooting
- Maintenance and Lubrication
- Maintenance
- Material Clean-Out
- Meter Brush Maintenance
- Steering Maintenance
- Hydraulic Maintenance
- Bleeding Hydraulics
- Marker Maintenance (Option)
- Chain Maintenance
- Spreaders and Scrapers
- Row-Unit Side Wheels
- Seed Flap Replacement(B1015J-)
- Fertilizer System Maintenance
- Lubrication
- Opener Side Wheel Bushing
- Meter Drive Chains
- Frame to Frame Parallel Arms
- Marker Arms (Option)
- Row Cleaner Bearings (Option)
- Wing Link Arms
- Wing Transfer Drive Shafts
- Caster Pivots (s/n B1026J-)
- Caster Pivots (s/n B1027J+)
- Caster Steering Tie Rods (s/n B1026J-)
- Caster Steering Tie Rod (s/n B1027J+)
- Caster Steering Spindle (s/n B1026J-)
- Caster Wheel Bearings
- Gauge Wheel Bearings (Ground Drive)
- Gauge Wheel Bearings (Hydraulic Drive)
- Gauge Wheel Yokes (Hydraulic Drive)
- Markers: Disk Hub
- Walkboard Pivot
- Seed Lubricants
- Options
- Appendix A - Reference Information
- Appendix B - Initial and Option Setup
- Appendix R - Row Pro
- Index