beautypg.com

3 installing the adsorption cartridges, Installing the adsorption cartridges – Metrohm 850 Professional IC Anion MSM-HC MCS Prep 1 User Manual

Page 76

background image

3.18 Metrohm CO

2

suppressor (MCS)

■■■■■■■■■■■■■■■■■■■■■■

66

■■■■■■■■

850 Professional IC – Anion MSM-HC – MCS – Prep 1

3

Aspirating capillary
For aspirating air low in CO

2

(as a result of

CO

2

adsorption cartridge (35-

4

)).

4

PEEK pressure screw, long 6.2744.090

5

Capillary connection

6

Pressure screw, short 6.2744.070
Mounted on the air aspirating capillary.

7

Luer coupling 6.2744.120
Mounted on the air aspirating capillary with
pressure screw 6.2744.070.

Connecting the MCS

1 Connecting the MSM

Connect the eluent output capillary (labeled with Detector) using a
6.2744.090 long PEEK pressure screw (34-4) to the MCS inlet (34-1).

2 Connecting the detector

Connect the detector input capillary (36-3) using a long PEEK pres-
sure screw 6.2744.090 (34-4) to the MCS output (34-2).

Caution

If the MCS is not used, the input and output should be sealed with
6.2744.220 stoppers.

3.18.3

Installing the adsorption cartridges

For effective CO

2

removal, the air sucked through the degassing cell

should be as low in CO

2

as possible. To achieve this, the air is aspirated

through a 6.2837.000 CO

2

adsorption cartridge (35-4).

Moisture can block the CO

2

adsorption cartridge. In order to prevent this,

a 6.2837.010 H

2

O adsorption cartridge (35-7) is connected upstream.