Metrohm 850 Professional IC Anion MSM-HC MCS Prep 1 User Manual
Page 111
■■■■■■■■■■■■■■■■■■■■■■
5 Operation and maintenance
850 Professional IC – Anion MSM-HC – MCS – Prep 1
■■■■■■■■
101
■
Check whether solution emerges at the MSM-HC connecting
piece (49-2). If one of the supply or discharge lines remained
blocked, the MSM-HC connecting piece (49-2) must be replaced
(order number 6.2835.010).
4 Cleaning the MSM-HC rotor A
■
Clean the sealing surface of the MSM-HC rotor A (49-3) with
ethanol using a lint-free cloth.
5 Inserting the MSM-HC rotor A
Caution
An incorrectly inserted MSM rotor A (49-3) can be destroyed
during start-up.
■
Insert the MSM-HC rotor A (49-3) into the MSM-HC housing
(49-4) in such a way that the tubing connections on the rear of
MSM-HC rotor A fit into the corresponding recesses inside the
MSM-HC housing and one of the three holes of the MSM-HC
rotor A is visible from below in the slot (49-5) of the MSM-HC
housing.
■
If the MSM-HC rotor A (49-3) is correctly inserted, its sealing sur-
face will be approx. 4 mm within the MSM-HC housing (49-4). If
this is not the case, the MSM-HC rotor A must be moved into the
right position from below using a sharp object (e.g. screwdriver).
6 Cleaning the MSM-HC connecting piece
■
Clean the sealing surface of the MSM-HC connecting piece (49-2)
with ethanol using a lint-free cloth.
7 Inserting the MSM-HC connecting piece
■
Insert the MSM-HC conencting piece (49-2) into the MSM-HC
housing (49-4) in such a way that the connector 1 is on top and
the three pins of the connecting piece fit into the corresponding
recesses on the MSM-HC housing (49-4).
■
Reattach the union nut (49-1) onto the coupling and tighten.
8 Connecting and conditioning the MSM-HC
■
Reconnect the MSM-HC to the IC system.
■
Before switching the MSM-HC over for the first time, rinse the
three suppressor units with solution for 5 minutes.