beautypg.com

Metrohm 850 Professional IC Anion MCS Prep 3 User Manual

Page 113

background image

■■■■■■■■■■■■■■■■■■■■■■

4 Operation and maintenance

850 Professional IC –Anion – MCS – Prep 3

■■■■■■■■

103

Detach the MSM connecting piece (54-2) from MSM rotor A
(54-3)
.

3 Cleaning the supply and discharge lines

Connect in turn each of the 6 capillary tubings fastened on the
MSM connecting piece (54-2) on the high pressure pump (see
Chapter 2.10, page 31)
and pump through ultra pure water.

Check whether solution emerges at the MSM connecting piece
(54-2). If one of the supply or discharge lines remained blocked,
the SPM connecting piece (54-2) must be replaced (order number
6.2832.010).

4 Cleaning the MSM rotor A

Clean sealing surface of the MSM rotor A (54-3) with ethanol
using a lint-free cloth.

5 Inserting the MSM rotor A

Caution

An incorrectly inserted MSM rotor A (54-3) can be destroyed
during start-up.

Insert the MSM rotor A (54-3) into the MSM housing (54-4) in
such a way that the tubing connections on the rear of MSM rotor
A fit into the corresponding recesses inside the MSM housing and
one of the three holes of the MSM rotor A is visible from below in
the slot of the MSM housing (54-5).

If the MSM rotor A (54-3) is correctly inserted, its sealing area will
be approx. 4 mm within the MSM housing (54-4). If this is not the
case, MSM rotor A must be moved into the right position from
below using a sharp object (e.g. screwdriver).

6 Cleaning the MSM connecting piece

Clean sealing surface of the MSM connecting piece (54-2) with
ethanol using a lint-free cloth.

7 Inserting the MSM connecting piece

Insert the MSM conencting piece (54-2) into the MSM housing
(54-4)
in such a way that the connector 1 is on top and the three
pins of the MSM connecting piece fit into the corresponding
recesses on the MSM housing (54-4).