Installation checklist, Checklist, Getting assistance from allen-bradley – Rockwell Automation 1329I Integrated AC Drive/Motor, Series B FRN 3.X User Manual
Page 7
![background image](/manuals/579007/7/background.png)
1329I-5.5 Integrated Drive/Motor — January, 2000
Checklist
Installation Checklist
This manual describes how to install, troubleshoot, and maintain the 1329I unit. Use
the following checklist to guide you through the installation process.
If problems occur during unit operation, refer to Chapter 11 for troubleshooting
guidelines.
Getting Assistance from Allen-Bradley
If you have any questions or problems with the products described in this instruction
manual, contact your local Allen-Bradley distributor.
Installation Procedure
Read Manual
Section(s)
❑
Step 1
Identify your unit
1.0
Understand how the
standard unit
operates
1.1
Understand how the
local operator control
unit
operates
1.2
❑
Step 2
Plan the installation
2.0
❑
Step 3
Mount the unit
3.0
❑
Step 4
Install external components
AC input disconnect
Branch circuit protection
Input isolation transformers
4.0
4.1
4.2
4.3
❑
Step 5
Wire AC power to the unit and ground the unit
5.0
❑
Step 6
Install a hardwired stop
6.0
❑
Step 7
Wire the control signal terminal strip
7.0
❑
Step 8
Verify the setup and adjust it if required
8.0
❑
Step 9
Check the installation
Perform power-off checks
Verify the direction of motor rotation
Attach the cover
Check the speed reference
9.0
9.1
9.2
9.3
9.4
❑
Step 10 Set the operating speed
10.0