beautypg.com

Set your meter to test diodes, Diode, 1 – 3 mw – Rockwell Automation 1336S, 1336F, 1336E, 1336T, 1336-SN-SP18A Snubber Board Kit User Manual

Page 25: 3 – 0.4v, Open, 0 – 200kw, 2 – 0.6 mw, 5 – 20 w

background image

1336-5.39 – August, 1999

I-25

1. Access the SCR Module. Refer to “SCR Module Access” on

page I-11.

2. Set your meter to test diodes.

3. The following table shows meter connections and ideal meter

readings for those connections. Refer to Figure I-11 for meter
connection locations.

4. Replace the SCR Module if any meter readings are not as shown.

Refer to “SCR Module Replacement” on page I-26.

5. If the SCR Module shorted, check the IGBT Modules for

damage.

Important: Refer to your Service or Troubleshooting Manual for
IGBT Module test information.

Assemble the drive in reverse order of removal. Refer to “Torque
Sequence” on page I-4.
Refer to “Torque Specifications” on page I-11
for final tightening.

Meter (+) Lead

Meter (-) Lead

Nominal Meter Reading

Volts

Ohms

Diode

1

3

1 – 3 M

open

3

1

0.3 – 0.4V

0 – 200K

SCR

1

2

open

0.2 – 0.6 M

2

1

open

0.2 – 0.6 M

2

G

0.005

5 – 20

G

2

0.005

5 – 20

!

ATTENTION: Replace all guards before applying
power to the drive. Failure to replace guards may result
in death or serious injury.