beautypg.com

Drive side bus-bar kit installation – Rockwell Automation 20G PowerFlex 750-Series Power Option Cabinets User Manual

Page 24

background image

24

Rockwell Automation Publication 750-IN030B-EN-P - October 2014

PowerFlex 750-Series Power Option Cabinets

Drive Side Bus-bar Kit
Installation

Installation of drive side bus-bar kits is performed after the cabinets are joined
and in their final position.

One kit is required for each phase.

Table 21 - 20-750-PBAY-RHBB-975, -1235, -1625, -2437 Kit Contents

1. Assemble the M10 carriage bolts and clamp plates.
2. Slide the carriage bolt assemblies into the cannel of the drive’s extruded

bus-bar.

3. Pass the drive side bus-bar through the access opening.

See

Modify Barrier Panels for Bus-bar or Wire Passage on page 18

4. Align the four bolts on the side bus-bar.

Description

Part No.

Quantity

Used with Bus-bar Kit No.

Drive Side Bus-bar

1

All

M10 x 45 mm Carriage Bolt

29220-903-02

4

20-750-PBAY-RHBB-975, -1235, and -1625

M10 x 50 mm Carriage Bolt

29220-903-03

4

20-750-PBAY-RHBB-2437

Bus-bar Clamp Plate

PN-37764

4

All

M10 Nut with Washer

29355-002-01

4

All

M8 x 30 mm Cap Screw

419062-5HKN

2

20-750-PBAY-RHBB-1235

M8 x 35 mm Cap Screw

419062-5HKP

2

20-750-PBAY-RHBB-975 and -1625

M8 x 40 mm Cap Screw

419062-5HKQ

2

20-750-PBAY-RHBB-2437

M8 Flat Washer

419064-1SK

2

All

M8 Lock Washer

29309-011-01

2

All

M8 Flange Nut

419063-201SK

2

All

IMPORTANT

Verify that clamp fits squarely in the bus-bar slot.

This manual is related to the following products: