Before using this unit, Installation procedure, 閉 運転時の位置 開 排水時の位置 – Yamato Scientific BB600 Low Constant Temperature Water Bath User Manual
Page 10: 本体 外部装置(密閉系
7
Before Using This Unit
Installation Procedure
1
Release the stopper lock of the casters.
Push down the stopper button of the casters as
shown in the right figure. It will be unlocked.
(Only the two casters on the front side of the unit
are equipped with a caster.)
2
Move the unit to the place of installation.
If there is a bump on the floor, the casters may receive excessive load and get damaged. In this
case, lift and move carefully by two or more persons.
3
After the unit is placed in the desired position, lock the stopper button of the casters.
4
Check the drain cock.
Confirm that the drain cock on the backside of the
unit is in the "Close" position (perpendicular to the
cock).
Confirmation of overflow.
Connect the attached hose for overflow and
prepare a container etc. separately.
5
For external sealed unit connection
(The package does not include any circulation hose. Please prepare it yourself.)
Connect the connection port of the main part to the circulation route of the external sealing system
so that there may be no leakage. Connect the hose to the return port (IN) and discharge port
(OUT) of the main part. The diameter of a hose nipple isφ10.5 ㎜. Refer to the following figure.
ボタン位置(高)
ロック状態(据付)
ボタン位置(低)
プッシュでロック解除
(移動可)
キャスター
Button position: high
Button position: low
Locked
(during installation)
Push to unlock the
caster (movable)
Caster
閉 運転時の位置
開
排水時の位置
Position during operation
Close
Position during draining
Open
本体
外部装置(密閉系)
戻り口
(IN)
吐出口
(OUT)
断熱ホース
断熱ホース
BB unit
Return
(IN)
Discharge
(OUT)
Insulation hose
Insulation hose
External unit
(sealed system)