beautypg.com

Dvvc, Installation manual, Dvvc installation – Titus Displacment Ventilation User Manual

Page 7

background image

DVVC Installation

Installation Manual

DV

5-9-13

Step 1
Drill the holes on the bottom plate of
the unit and the mounting base. Install
the mounting base into place using
screws.

Step 3
Install wall bracket to the wall to hold the
top of the unit using screws.

Commissioning (Balancing)
The balancing port is positioned on the
side behind the decor strip. The K-factor of
the unit is stated on the K-factor label
mounted on one of the side of the
balancing port. The k-factor can also be
found on our website in the relevant k-
factor guide. See Figure 5

Step 2
Install wall brackets to the wall using
screws and slide the bottom of the unit
into the angle wall brackets.

3.0

FIGURE 4