beautypg.com

Burnham SCG 1100-H4 User Manual

Page 72

background image

7

Figure 4: Silicone Tubing Assembly

Figure 4: Blower Vent Connector Assembly

d. Remove wires to Flame Roll-out Switch.
e. Remove air diffuser screen.
f. Remove Burner Access Panel.
g. Mark location of Main Burner with Pilot Bracket

on gas manifold.

h. Hold Main Burner on throat. Lift front of

burners to clear orifice. Burner which holds pilot

can be removed by lifting the burner adjacent to

its right first.

2. Disconnect Vent Connector and Vent Pipe from

Blower Outlet

3. Remove Jacket Top Panel.
4. Disconnect the Black and Gary Silicone Tubing

from the Canopy.

5. Disconnect Wiring Harness from Blower Motor.
6. Remove Canopy/Blower Assembly.

a. Loosen the (4) screws from Canopy.

7. Remove Flue Gas Baffles. Inspect Flue Gas Baffles

for deterioration.

8. Inspect flue passages. Clean with flue brush. See

Figure 44.

9. Inspect heating surface in combustion chamber.

Clean with straight handle wire brush.

10. Install Flue Gas Baffles.
11. Replace Canopy/Blower Assembly.
12. Connect Silicone Tubing between Pressure Fittings

on Canopy Assembly and Pressure Switch. Route

through bushings in Vestibule Panel . See Figure

42.

13. Install Jacket Top Rear Panel.
14. Connect Vent System. See Figure 43.
15. Connect Blower Motor Wiring Harness.

TABlE 14: PIlOT BURNER lOCATION

Boiler Model

Main Burner with Pilot Bracket

Pilot Burner Located Between Main Burners *

SCG-3

2

2 & 3

SCG-4

3

3 & 4

SCG-5

4

4 & 5

SCG-6

5

5 & 6

SCG-7

6

6 & 7

SCG-8

7

7 & 8

SCG-9

8

8 & 9

* Main burners numbered left to right as viewed from front of boiler.