c. From exterior of building, insert air box sub-

assembly into square opening. Push air box

inward until wall flange is against wall, check

for level and mark the location of the four (4)

securing holes on the exterior wall. Remove air

box from wall.

d. Drill four (4) pilot holes, properly sized for the

non-corrosive fasteners (stainless steel, brass, or

aluminum) to be used to secure the wall flange to

the exterior wall. (Securing screws not supplied

with kit.)

e. Attach four (4) 1/2 inch long threaded aluminum

spacers to the outer flanges of the exterior

wall flange with four (4) number 10 - 32 x 1/4

inch stainless steel machine screws provided.

(See Figure 11.)

f. Apply a 1/4 inch thick continuous bead of

silicone caulk to perimeter of exterior wall

flange’s back surface to provide a weathertight

seal.

g. Reinstall air box sub-assembly into opening in

exterior wall and secure to wall.

WARNING

Non-corrosive fasteners must be used.

h. Apply a bead of silicone caulk to perimeter of

wall flange, where the wall and flange join. Use

a tool or your finger and apply pressure while

smoothing caulking to provide a weathertight

seal.

i. From interior of building, insert end panel with

collar and vent pipe assembly into open end of

air box sub-assembly. (See Figure 11.)

j. Secure end panel to air box sub-assembly with

shipping screw and thirteen (13) number 8 sheet

metal screws provided.

k. From exterior of building, position 10 inch

square exterior wall cover over exterior wall

flange. Insert 3 inch diameter vent pipe into

center opening in terminal cover. Align four

(4) holes on cover with 1/2 inch long threaded

spacers on wall flange. Secure terminal cover

with four (4) number 10 - 32 x 1/4 inch stainless

steel machine screws provided.

l. Apply a bead of silicone caulk to perimeter of

plate-seal and around pipe. Secure plate-seal to

exterior cover with six (6) #8 stainless steel sheet

metal screws provided. Smooth caulk around

plate-seal and pipe to provide weathertight seal.

m. Install Vent Terminal supplied with boiler to vent

pipe penetrating through terminal cover. Join

terminal and pipe with locking band and seal

with RTV (see Figure 3).

3.

Install Vent Piping

. See Figures 10 and 11.

a. Start at vent connector on boiler, see Figure 43

on Page 72, and work towards combination vent/

air terminal.

b. Installation of a vertical vent tee 8116304U is

required on all vertical vent applications. See

Figures 12 and 13. Attach vertical vent drain

tee directly to elbow or horizontal pipe from an

elbow immediately after vent connector.

c. Slope horizontal runs minimum ¼ inch per foot.

Slope towards vertical vent drain tee. Position

weld seams in vent pipes, in all horizontal runs,

at the top to avoid condensate from lying on the

seams.

d. Use 3/4 inch pipe strap to support horizontal runs

and maintain vent location and slope. Maximum

support spacing is five (5) feet.

e. Install vent piping to connect vent connector

on boiler and combination vent/air terminal.

Reference Section B - General Venting

Guidelines for proper procedure for joining pipe

and fittings.

f. Connect vent piping to combination vent/air

terminal. See Figure 10.

4.

Install Air Intake Piping

. See Figures 10 and 11.

a. Do not exceed air intake length. See Table 4.
b. Use single wall metal pipe or PVC and fittings

available at most heating distributors.

c. Air intake pipe diameter is based on boiler size.

SCG-3 & SCG-4 uses 3 inch diameter piping.
SCG-5 & SCG-6 uses 4 inch diameter piping.
SCG-7 thru SCG-9 uses 5 inch diameter piping.

d. Start at collar on burner enclosure (inside boiler

jacket) and work towards the combination vent/

air terminal.

e. Maintain minimum of 1/4 inch per foot slope on

horizontal runs. Slope down towards boiler.

f. The air intake pipe must be adequately supported

with straps or supports no less than five (5)

feet apart on horizontal runs. The complete air

intake piping system must be rigid and able to

withstand minor impacts without collapse.

g. Connect Air Intake Piping to Combination Vent/

Air Terminal. See Figure 10.

NOTE: When installing 3 inch diameter air intake

piping for a SCG-3 or SCG-4 application, the use of

a 4 inch x 3 inch reducer will be required to connect

air intake piping to combination vent/air terminal.

(Reducer included with combination horizontal

venting kit).
h. Seal all joints airtight, using silicone caulk or

self-adhesive aluminum tape.