Notice – Burnham SCG 1100-H4 User Manual
Page 23
COMBINATION hORIZONTAl VENT SySTEM COMPONENTS
F.
Combination Horizontal Venting System –SCG-3 Through SCG-6 ONLY – See Figures 10 and 11.
1. Do not exceed maximum vent/air intake lengths.
Refer to Table 4.
2.
Install Combination Vent/Air Terminal.
See Figure 11.
a. After determining the location with reference to Section B - General Venting Guidelines, cut a 6-1/8 inch square
opening in the wall for the air box sub-assembly which is 6 inch square.
b. Remove and save shipping screw from end panel with collar and vent pipe assembly. This will be reinstalled in a later
step.
NOTICE
This vent system requires components not
supplied with the boiler.
Vent Carton Part Number 61106012 (Includes Items Below)
Description
Component Part Number
A Air Box Sub-Assembly (6” square x 2’ long)
61106011
B Exterior Wall Cover (10” square)
71106016
C 4” x 3” Vent Pipe Reducer
8116239
D Plate-Seal Exterior Cover (2)
71106017
E #8 x ½” Stainless Steel Sheet Metal Screw (19)
80860047
F #10 - 32 x ¼” Stainless Steel Machine Screw (8)
80860842
G #10 - 32 x ½” Aluminum Spacer (4)
80861617