beautypg.com

Install the specimen – MTS TestLine User Manual

Page 81

background image

a) If necessary, click the Station Setup button.
b) Select Channels > Ch1 > Force > Channel Input Signals button > Offset/Zero tab.
c) Click the Auto Offset button.

Install the Specimen

1. If necessary, install the load cell on the actuator and connect the load cell signal cable.

2. Install the threaded rod into the load cell.

MTS TestLine Test System Operation | 81

Running the Example HCF Test