beautypg.com

MTS TestLine User Manual

Page 119

background image

Annually

Biweekly

Weekly

Daily

Calendar Time using 8 hour Running
Time rate per day

2,000

1,500

1000

500

80

40

8

Running Time-Hours

MTS

MTS

MTS

MTS

Check that manifold hose connections are
tight.

MTS

MTS

MTS

MTS

Check that accumulator connections are
dry.

MTS

MTS

MTS

MTS

Check that accumulator connections are
tight.

MTS

MTS

MTS

MTS

Check that accumulator caps/guards are
present.

MTS

MTS

MTS

MTS

Check that there is oil on the gas side of
the piston.

MTS

MTS

MTS

MTS

Check and adjust pressure in accumulator.

MTS

Change filters.

Hoses/Cables

MTS

MTS

MTS

MTS

Check hoses/cables/connectors.

MTS

MTS

MTS

MTS

Check for absence of hose abrasions,
blisters, vulcanizing.

MTS

MTS

MTS

MTS

Check that cable condition and routing is
acceptable.

MTS

MTS

MTS

MTS

Check transducer connections.

MTS

MTS

MTS

MTS

Check that hose connections and crimps
are dry.

Complete System

MTS

MTS

MTS

MTS

Check that overall system condition is
acceptable for use.

MTS

MTS

MTS

MTS

Check that tuning parameters are
appropriate and that system is stable.

MTS

MTS

MTS

MTS

Check that E-Stop is working if applicable.

MTS TestLine Test System Operation | 119

Maintenance