beautypg.com

3establish communication – Lenze I/O system 1000 User Manual

Page 13

background image

Lenze · I/O system 1000 · commissioning guidelines for the PLC Designer · DMS 1.2 EN · 11/2012 · TD05

13

3

Establish communication

3.2

Establish a connection between L-force Controller and I/O system 1000

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Double-click the channel to be set as active path for control below the gateway in the

Device view.

• Thus, all communication actions directly refer to this channel.
• The channel currently active is displayed in bold in the Device view and marked with the

"(active)" addition:

• A channel represented in italics is set as active path but has not been identified at the last

network scan.

3.2

Establish a connection between L-force Controller and I/O system 1000

For a connection via EtherCAT:

• Connect the RJ45 port on the EtherCAT bus coupler module (EPM-S130) to the L-force Controller

using a network cable.

• The I/O system 1000 is supplied with DC 24 V for the control electronics.

[3-1]

The EtherCAT interface at the L-force Controller 3231 C

Further information can be found in the following documentation:

• L-force Controller - Parameter setting & configuration