3establish communication – Lenze I/O system 1000 User Manual
Page 13
Lenze · I/O system 1000 · commissioning guidelines for the PLC Designer · DMS 1.2 EN · 11/2012 · TD05
13
3
Establish communication
3.2
Establish a connection between L-force Controller and I/O system 1000
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Double-click the channel to be set as active path for control below the gateway in the
Device view.
• Thus, all communication actions directly refer to this channel.
• The channel currently active is displayed in bold in the Device view and marked with the
"(active)" addition:
• A channel represented in italics is set as active path but has not been identified at the last
network scan.
3.2
Establish a connection between L-force Controller and I/O system 1000
For a connection via EtherCAT:
• Connect the RJ45 port on the EtherCAT bus coupler module (EPM-S130) to the L-force Controller
using a network cable.
• The I/O system 1000 is supplied with DC 24 V for the control electronics.
[3-1]
The EtherCAT interface at the L-force Controller 3231 C
Further information can be found in the following documentation:
• L-force Controller - Parameter setting & configuration