Cleaning, disinfection and maintenance – Leica Biosystems SP2600 User Manual
Page 47
47
Leica SP 2600 Ultramilling attachment
7.2.2 Replacing the light bulb in the calibration device
Remove base cover (2) of calibration device (1) (unscrew 4 slotted
screws (3)).
Loosen light bulb holder (5) (metal bridge with lamp socket) (unscrew 2
slotted screws (4)).
Take replacement light bulb (8) out of sponge rubber cube (7).
Remove broken light bulb (6) from lamp socket and replace with new
light bulb (8).
Place another replacement bulb (8) into the sponge rubber cube (7).
Put light bulb holder (5) back in place.
Place ring with cable (9) onto bore (10) in the light bulb holder.
Fasten light bulb holder with two screws (4).
Put sponge rubber cube (7) with new replacement light bulb (8) back into
the calibration device.
Put base cover (2) back in place and fasten with 4 screws (3).
7. Cleaning, disinfection and maintenance
Fig. 7.1
7
8
2
3
4
6
5
10
9
1
- SM2010 R (46 pages)
- CM305 S (66 pages)
- CE Knife holder (14 pages)
- CM1950 (78 pages)
- VT1200/VT1200 S (62 pages)
- VT1000 S (42 pages)
- HI1220 (18 pages)
- HI1210 (18 pages)
- CM1850 UV (56 pages)
- CM1850 UV (54 pages)
- CM1510-S (56 pages)
- CM3600 XP (114 pages)
- CM1100 (36 pages)
- CM1860/CM1860 UV (98 pages)
- Premium blade holder (14 pages)
- CM1520 (92 pages)
- VT1000 A (49 pages)
- VT1000 P (48 pages)
- SM2500 (76 pages)
- SM2400 (8 pages)
- SM2000R (22 pages)
- EG1160 (32 pages)
- EG1150 C (20 pages)
- EG1150 H (42 pages)
- EG1130 (2 pages)
- EG1120 (2 pages)
- EG F (18 pages)
- ASP300 (70 pages)
- PELORIS_PELORIS II (160 pages)
- TP1020 (102 pages)
- ASP200 S (88 pages)
- ASP300 S (88 pages)
- ASP6025 (178 pages)
- LN22 (44 pages)
- RM CoolClamp (20 pages)
- RM2265 (88 pages)
- RM2255 (82 pages)
- RM2245 (78 pages)
- RM2235 (78 pages)
- RM2125 RTS (60 pages)
- SP9000 (30 pages)
- SP1600 (10 pages)
- ST4040 (50 pages)
- ST5020 (88 pages)