beautypg.com

Assembly instructions – Landoll PFT Floating Ring Pulverizer User Manual

Page 14

background image

298rev401

5K089

16”(Approx.)

FRAME

BOLT, 1 1/4” X 9 1/2”

1 1/4” LOCK NUT

w/ PLASTIC INSERT

BRACE

BOLT, 1” X 5 1/2”

FLAT WASHER, 1”

LOCK NUT, 1”

DRAWBAR

FRAME

CLEVIS

BOLT, 5/8” X 8 1/2”

LOCK NUT, 5/8”

LOCK NUT, 1”

BOLT, 1” X 9 1/2”

CAPSCREW, 3/8” x 1”

LOCK NUT, 3/8”

FIGURE 10

FIGURE 11

Page 12

ASSEMBLY INSTRUCTIONS

ROLLER & FRAME

The roller and frame are pre-assembled at the factory.

1. Place blocks both behind and in front of the packer wheels. Using an overhead hoist, raise the

frame so that it is about 16 inches off the ground. Use at least three blocks to secure the frame

in this position.

NOTE: The blocking must be able

to support 1000 pounds.

DRAWBAR

2. Bring the rear of the drawbar into position between the hitch plates at the center of the frame.

Attach the drawbar to the frame with the 1 1/4" diameter by 9 1/2" bolt and lock nut. The nut

should be tightened so that the frame is free to pivot on the drawbar.

This manual is related to the following products: