beautypg.com

4 operation, 1 status indication – INFICON Cube CDGsci User Manual

Page 27

background image

tina88e1-b (2014-09)

27

4 Operation

Put the gauge into operation. A warm-up time of at least 90 min-
utes should be allowed; for precise pressure measurements a
warm-up time of at least 4 hours is required.

4.1 Status

Indication

LED LED

status

Meaning

off

no supply voltage

lit solid green

measurement mode

blinking

green

short blinks
long blinks


over/underrange
warming up

lit solid red

main CPU error
temperature PCB >90 °C
temperature sensor defective

blinking red

while zero adjust (<8 s)
heating temperature too high
end of life (EOL)
initialization of the gauge

lit green green

p ≤ setpoint 1

blinking green

waiting for setpoint 1 input

off

p > setpoint 1

lit solid green

p ≤ setpoint 2

blinking green

waiting for setpoint 2 input

off

p > setpoint 2