6 unpacking and parts list, 1 unpacking, 2 inventory of parts – CiDRA GVF-100 Gas Volume Fraction Monitoring System User Manual
Page 16: Unpacking and parts list -1, 1 unpacking -1 6.2 inventory, Parts -1, Table 1 sonartrac, Gvf-100 parts list -1, Unpacking and parts list

Copyright © 2006 CiDRA Corporation
Page 6-1
20639-01 Rev 03
6
UNPACKING AND PARTS LIST
6.1 Unpacking
The SONARtrac
TM
GVF-100 will typically be packaged in three
shipping containers. One box will contain the sensor band and sensor
cover assemblies, and installation hardware; the second box will
contain the transmitter assembly and installation hardware; and the
third box will contain the sensor to transmitter cable assembly.
Note:
Cidra Corp. recommends the original packing materials be
saved in the event that the system is removed or relocated.
CAUTION
Use care in unpacking and transporting system. Improper
handling may result in damage to system components.
Whenever possible use the original packing materials to transport the
system to the installation site to minimize the likelihood of damage.
WARNING
Static discharge may occur when handling sensor band and
packing material. Remove from packing materials when entering
hazardous areas. Always keep the sensor band shorting plug
installed until sensor band is installed on the process pipe.
6.2 Inventory
of
Parts
Table 1 lists the parts contained in the shipping containers.
Description
SONARtrac
TM
GVF-100 Gas Volume Fraction Process Monitoring
System
Sensor Head Cable
Installation Hardware
Sealant, Joint and Thread, PTFE Paste, 3.5 oz Tube – included with
fiberglass sensor cover assemblies
Gauge, Spring Gap (used for sensor installation) - included with sensor
band assembly
Model GVF-100 Gas Volume Fraction Process Monitoring System
Installation & Startup Manual
Kit, Parts, Pole Mounting (Option)
Sensor Rain Guard Kit for vertical installations (Option)
Table 1
SONARtrac
TM
GVF-100 Parts List