Battery installation (ee spec machines only), Fuse box - (ee spec machines only), Master disconnect switch - (ee spec machines only) – JLG DVSP Series Service Manual User Manual
Page 63

SECTION 4 - CONTROL COMPONENTS
3121136
– JLG Lift –
4-5
Battery Installation (EE Spec Machines Only)
Fuse Box - (EE Spec Machines Only)
Master Disconnect Switch -
(EE Spec Machines Only)
Battery Installation - (UL-EE - Only)
1. Box Cover
4. Hold-Down Bolt/Washer/Nut
2. Battery
5. Hold-Down Bar
3. Box Assembly
Note:
See Figure 4-2. for wiring connection instructions.
Installation same for either side battery.
Fuse/Box - Installation - (UL-EE - Only)
1. Fuse Box
3. Fuse Box Cover
2. Fuse
4. Cover Mounting Screws
Note: See Figure 4-2. for wiring connection instructions.
1
2
3
4
5
1
2
3
4
Master Disconnect Switch Installation - (UL-EE - Only)
1. Switch Lever
5. Switch
2. Mounting Nut
6. + (Pos) Battery Cable
3. Mounting Bracket
7. Cable Nuts
4. Mounting Nut
Note: See Figure 4-2. for wiring connection instructions.
1
2
3
4
5
6
7