Preventive maintenance and inspection schedule -7 – JLG M4069 ANSI Service Manual User Manual
Page 27
SECTION 2 - GENERAL
3121122
– JLG Lift –
2-7
NOTE: If function speeds are slow on a fully charged
machine a clogged filter may be indicated. Change
filter.
Table 2-3. Preventive Maintenance and Inspection Schedule
AREA
INTERVAL
PLATFORM
10 HOURS
DAILY
50 HOURS
WEEKLY
200 HOURS
MONTHLY
500 HOURS
3 MONTHS
1000 HOURS
6 MONTHS
1. Controller
1, 11
2. Switches
1, 11
3. Placards and Decals
1, 2
4. Control Tags
1, 2
5. Hoses and Cables
1
5, 8
6. Wear Pads
8
7. Handrail and Chains
1, 4
CHASSIS
1. Batteries
3
5
2. Battery Charger
1
3. Hydraulic Pump/Motor
1
5
4. Valves
1
5
5. Hydraulic Filter* (Also see note)
5, 14
14
6. Hydraulic Hoses and Tubing
1
5
7. Hydraulic Oil Tank*
3
5
4
8. Breather - Hydraulic Tank
6, 14
9. Lift Cylinder
1
5, 6,13
4
10. Limit Switch
1, 7
11. Placards and Decals
1, 2
12. Wheel and Tire Assemblies
1
8, 9
13. Drive Motors
1, 5
1, 6
14. Drive Torque Hubs
1, 3, 5
1, 3, 5, 6
6
15. Drive Brakes
1, 6
8
16. Steer Cylinder
1
5, 6, 13
4
17. Steer Components
1
4, 6
8
18. Wheel Bearings
8
19. Sizzor Arms
1, 4
20. Safety Prop
1, 4
21. Wear Pads
8
22. Pivot Pins/Bolts
1, 4
7, 8
23. Switches, Ground Control
1, 11
24. Control Tags
1,2
25. Hose and Cable
1
4, 8
* Inspection and Maintenance Code 10 to be performed annually.