beautypg.com

Iv installation, B - installing the canisters – Fluid Management 22CW Blendorama User Manual

Page 9

background image

FAST & FLUID MANAGEMENT

PAGE NO. 9 of 27

CW - V1.2 – 10- 05- 2012 (36609) – rev, B

IV

INSTALLATION

B - Installing the canisters

Please note that this procedure is used for all canister sizes, although only 1.75L (22X) canisters are shown
here. Other canister assemblies will vary in size and appearance, however the procedure remains the same.






>

>






(1) Select a canister assembly.

(2) Fit the canister screws

into the outer ring of keyhole
slots on the turntable. Push
firmly into position.

(3) Locate the 2 guide holes
directly below each canister
and fasten the screws
(already located in canister)
with a Philips (No. 2)
screwdriver.
(4) Check canister is firmly
secured.
(5) Repeat steps (2) to (4) for
all other outer ring canister
assemblies.



Attention!

It is important that the canisters are assembled and installed

correctly to ensure stability of the canisters on the turntable and correct
functioning of the stirring mechanism.