beautypg.com

Voperation – Fluid Management 22CW Blendorama User Manual

Page 12

background image

FAST & FLUID MANAGEMENT

PAGE NO. 12 of 27

CW - V1.2 – 10- 05- 2012 (36609) – rev, B

V

OPERATION

Step 2

Purging the pumps

>



>






Set the gauge or gauges of
each pump to its halfway point
by operating the spring loaded
button then lifting the gauge by
its handle

Without operating the valve
lever lift the pump handle to
its maximum travel (this
draws the colorant into the
canister)

Discharge the colorant back
into the canister by
depressing the pump handle
fully. Repeat this process 30
times.

Step 3

Purging the valve






>

>






Lift the pump handle to its
maximum travel

Place a can or paper cup
under the dispensing nozzle








>

>

Hold the valve lever open by
pulling the spring loaded lever
forward its full travel






Push the pump handle down
fully to dispense colorant into
the cup

Release the valve lever

Repeat this process until the
colorant emerges as an
unbroken stream