Voperation, A - first time operation – Fluid Management 22CW Blendorama User Manual
Page 11

FAST & FLUID MANAGEMENT
PAGE NO. 11 of 27
CW - V1.2 – 10- 05- 2012 (36609) – rev, B
V
OPERATION
A - First time operation
Step 1
Preparing the dispenser
>
Ensure that the machine is
switched off at the wall socket
Stir each can of colorant
thoroughly with a flat
bottomed paddle or palette
knife to reincorporate any
settled pigment
Ensure that the machine is
adequately supported and
clear of obstructions
>
Remove the lids from all
canisters
Pour the contents of each
colorant can into the correct
canister. Discard the colorant
can and replace the canister
lid
Attention! Always wear eye protection when handling colorants