Iv installation, A - unpacking the dispenser – Fluid Management 22CW Blendorama User Manual
Page 8

FAST & FLUID MANAGEMENT
PAGE NO. 8 of 27
CW - V1.2 – 10- 05- 2012 (36609) – rev, B
IV
INSTALLATION
A - Unpacking the dispenser
The machine is packed in a box which will contain the following:
1 x Machine Base Assembly including turntable
Canisters (as ordered), each with a lid, attached pump and fixing screws
1 x Operation Manual
Power Supply cable.
A plastic bag or box containing:
1 x Allen Key for Pump Calibration (Note: Pumps preset in factory)
1 x No. 2 Phillips head screwdriver (for attaching canisters)
In case of floor stand models, a kit of parts is supplied in the same box to convert bench
model to floor model. (Assembly instruction manual will be provided with the kit)
If any of these parts are missing, contact your supplier or F&FM immediately.