Vi preventitive maintenance, B - daily maintenance – Fluid Management 22CW Blendorama User Manual
Page 17

FAST & FLUID MANAGEMENT
PAGE NO. 17 of 27
CW - V1.2 – 10- 05- 2012 (36609) – rev, B
VI
PREVENTITIVE MAINTENANCE
B - Daily maintenance
Clean the machine, refill canisters and check for blockages
>
>
Wipe down stand, canisters
and pumps with a moistened
cloth
Check nozzle outlets for dried
colorants.
If dried colorant is found to be
blocking the nozzle, open the
valve to remove and replace
the nozzle. Ensure the o-ring
is retained. Clean the nozzle
using warm soapy water
Refit the nozzle and dispense
a small amount of colorant