Burnham MEGASTEAM MST288 User Manual
Page 23
3
wARNING: Do not operate a single line system with the
by-pass plug installed. Operating a single
line system with the by-pass plug installed
will result in damage to the pump shaft seal.
NOTE: Pump pressure was factory pre-set but must
be checked at time of burner start-up. A
pressure gauge is attached to the PRESSURE/
BLEEDER PORT (7) for pressure readings.
Two PIPE CONNECTORS (4) are supplied
with the burner for connection to either a
single or two-line system. Also supplied
are two ADAPTORS (3), two female ¼”
NPT to adapt oil lines to burner pipe
connectors. All pump port threads are British
Parallel Thread design. Direct connection
of NPT threads to the pump will damage the
pump body.
Riello manometers and vacuum gauges do not
require any adapters, and can be safely
connected to the pump ports. An NPT x
metric adapter must be used when connecting
other gauge models.
viii. Replace Burner Cover and Tighten Burner
Cover Screws.
c. Place oil burner gasket on burner and align holes.
d. Remove three (3) 5/16-18 x 3/4 lg. cap screw
from burner swing door used for mounting
burner.
e. Thread (1) 5/16-18 x 3/4 lg. cap screw,
approximately three (3) full turns, into tapping
located at 12:00 o'clock on burner swing door.
f. Insert oil burner into the opening of burner
swing door. Align and engage keyhole slot in
burner flange over head of protruding cap screw
installed in previous Step. Rotate burner to the
right to lock flange behind head of cap screw.
g. Align holes and install two (2) remaining cap
screws. Level burner and fully tighten all three
(3) screws.