beautypg.com

Inspection and service – Bosch GREENSTAR 24i junior User Manual

Page 40

background image

INSPECTION AND SERVICE

4

Remove electrical connector from fan.

5

Undo and remove securing nut (E) from the
top of the heat exchanger.

6

Remove stainless steel viewing mirror (F).

7

Rotate fan and air/gas manifold assembly (G)
around the top of the heat exchanger until it
stops at the lug.
Lift up assembly and remove from boiler.

8

Disconnect spark electrode and flame sensor
connections (J).
Remove clamping plate (K).
Remove spark/flame electrode assembly
from boiler.
Remove seal from the top of the heat
exchanger

5

6

E

F

8

K

J

7

G

4

INSPECTION AND SERVICE

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior

8 716 107 336b (11/05)

39

SER

V

IC

IN

G

&

SP

A

RES

This manual is related to the following products: