beautypg.com

Inspection and service – Bosch GREENSTAR 24i junior User Manual

Page 37

background image

INSPECTION AND SERVICE

Component Access

1. Removing outer case

1.

Remove bottom panel by pulling it forward
and off.

1.1

Undo and remove 2 screws (A) securing
boiler casing at the top of the appliance.

1.2

Undo but do not remove the 2 screws
(B) securing boiler casing at the bottom of
the appliance.

1.3 Pull case forward and remove.

2. Adjusting boiler control to

service position

2.1 Remove screw (C) securing control.
2.2 Gently pull forward until it comes to

rest in service position.

Primary Heat Exchanger

There is a special accessory kit available

specifically designed for cleaning the

heat exchanger. If required order

7 716 192 312.

3

Check fan pressure at the test point next to

the fan using an electronic manometer.
The boiler must be run at maximum output.
Pressure will read negative and be greater
than:

Natural gas

LPG

24i junior - 3.1 mbar 24i junior - 3.6 mbar
28i junior - 3.9 mbar 28i junior - 4.6 mbar

Pressures measured below these figures
will indicate that the heat exchanger will
require cleaning.

3

A

1.1

1.2

1.3

B

1.

C

2.1

2.2

INSPECTION AND SERVICE

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)

36

SER

V

IC

IN

G

&

SP

A

RES

This manual is related to the following products: