PRE-COMMISSIONING CHECKS

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior

8 716 107 336b (11/05)

29

C

O

M

M

ISS

IO

N

IN

G

A

E

B

C

D

22mm 15mm 22mm 15mm 22mm

1

2

3

F

J

PRE-COMMISSIONING

CHECKS

CAUTION: ISOLATE THE MAINS
SUPPLIES BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS

1 Check that the service and water pipes are

connected to the correct position on the
manifold.

A - CH Flow (22mm)

B - CH Return (22mm)

C - Gas inlet (22mm)

D - DHW (15mm)

E - Water in (15mm)

2 Check the gas type specified on the

identification plate (F) matches that of the
gas supply. Turn on the main gas supply,
check the gas pipework, connections and
rectify any leaks.

3 Check that the condensate pipe has been

connected to the syphon.

4 Check pressure relief drain pipe (J) is

correctly fitted and securely tightened.

IMPORTANT: If the boiler is not to be
commissioned immediately then:
after successfully completing all of the
checks and any rectification work,
close the gas and water valves, shut off
the gas supply and electrically isolate
the boiler and label appropriately.