beautypg.com

Boiler connections – Bosch GREENSTAR 24i junior User Manual

Page 23

background image

BOILER CONNECTIONS

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)

22

IN

ST

AL

LA

TI

O

N

BOILER CONNECTIONS

CAUTION: ISOLATE TH E MAI NS GAS
SUPPLY BEFORE STARTING ANY WORK
AND OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.

A

E

D

B

C

22mm 15mm 22mm 15mm 22mm

5

F

H

GAS AND WATER CONNECTIONS:

A - CH flow (22mm), B - CH return (22mm),

C - Gas inlet (22mm), D - Mains water inlet

(15mm), E - DHW outlet (15mm)

5. Lower the control panel into the service

position by removing the screw (F) from the

retaining bracket.

6. Make connections to the heating system.

Connect the gas supply to the boiler gas

cock 22mm compression.

Connect mains water in and DHW out.

7. Connect the expansion vessel flexible

pipe to the hydraulic manifold situated left of

the pump. It is necessary to remove and

discard the gray plastic blanking plug (G)

from the pressure vessel connection at the

hydraulic manifold before securing the

expansion vessel flexible pipe (H) in place

with the wire retaining clip ( I ) .

8. Connect the pressure relief drain pipe to

15mm compression joint (J) using the

compression nut and olive supplied in the

hardware literature pack.

6

7

G

I

I

H

H

J

A E C D B

This manual is related to the following products: