beautypg.com

Wall mounting template flue opening, 2a b – Bosch GREENSTAR 24i junior User Manual

Page 20

background image

WALL MOUNTING PLATE FLUE OPENING

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior

8 716 107 336b (11/05)

19

IN

ST

AL

LA

TI

O

N

C

O

MMI

S

S

IO

N

IN

G

SAFETY:
All relevant safety precautions must be undertaken.
Protective clothing, footwear, gloves and safety
goggles must be worn as appropriate.

FIXING THE MOUNTING FRAME:

The boiler template shows the relative

positions of the flue and the top and bottom

fixing of the mounting frame.

Fix the template to the wall in the desired

position (A).

Drill 4 holes for the wall mounting frame

through the template (2).

NOTE: The template has been sized to allow for

minimum clearances of 5mm sides, 200mm

base and 30mm above a Ø100mm flue elbow.

REAR FLUE OUTLET

The drawing (B) opposite shows the boiler

template with the flue centre lines of both the

100mm and 125mm flue systems.

Mark centreline of flue to be used (1); the

external diameter of the hole can also be

marked if required.

If a Ø100mm diameter flue is to be used,

a125mm diameter hole is required. However, if

using the weather sealing collar by pushing it

through from inside the property, then a

150mm diameter hole is required to

accommodate this.

• The terminal section of the 100mm flue has an

inbuilt 3° angle.

If extensions are to be added then the complete

flue must rise at an angle of 3°.

• The 125mm Ø flue system will require the flue

to rise at an angle of 3°.

Drill hole using a core drill or similar.

SIDE OUTLET:

Mark from the centre line of the wall template

to the wall which the flue will pass through (3).

Allow for a rise of 52mm per metre length of

flue, to give a 3° angle.

Clear any debris from the site.

• A pre-filling kit 7 716 192 282 is available for

installations where the boiler will not be fitted

immediately to the heating system. This allows

the heating system and mains water connec-

tions to be filled and checked prior to boiler

installation.

This kit can be used in conjunction with the

optional filling loop 7 716 192 281(not sup-

plied with the boiler).

CAUTION: Ensure there are no pipes,
electric cables, damp proof courses or
other hazards before drilling.

WALL MOUNTING TEMPLATE

FLUE OPENING

189mm

2

A

B

X 4

X 4

USE APPROPRIATE
FIXINGS FOR
WEIGHT AND
WALL TYPE

This manual is related to the following products: