beautypg.com

Myron L 729II User Manual

Page 14

background image

4. Slide the enclosure through the panel cutout

until its flange contacts the panel.

5. Insert mounting screws through the flange

mounting holes and tightly secure.

6. Reconnect all panel cable(s)/wires and re-

secure the front panel using 6-32 x 3/8” screws

provided.

Caution: Do not use 6-32 x 1/2” used on “picture frame” front

panel models.

C.

CIRCUIT BOARD AND DISPLAY MOUNTING

This section provides the recommended procedures for properly

installing the OEM 720 Series II pH/ORP Monitor/controller.

NOTE: Mounting of the OEM monitor/controller circuit board is

left up to the OEM. It is recommended that the following be noted

and observed.

1. CIRCUIT BOARD

Total height of CB is 1.40” (36mm).

The circuit board has four .175” (4.4 mm) holes for mounting. The

centers are 3.10” (78.7 mm) x 4.10” (104.1 mm) see figure II.C.1.

CB must be mounted on at least .250” (6.35 mm) standoffs to

prevent shorting to metal chassis (standoffs user supplied).

CB must be mounted in a clean and dry environment.

Allow working room for inserting wires, testing and calibration.

Indicator lights and switches require 1/4” (6.35mm) holes.

2. METER MOVEMENT

Refer to figure II.C.2 for dimensions.

1. Cut opening in user panel.

2. Drill four holes at locations as shown.

3. Install meter movement.

3. DIGITAL DISPLAY

Refer to figure II.C.3 for dimensions.

1. Cut opening in user panel

2. Install LCD with brackets supplied.

10

3.100

(78.74)

4.100

(104.1)

4.585

(116.5)

3.600

(91.44)

Figure II.C.1

Figure II.C.3

2.390

(60.71)

.980

(24.89)

Digital Display Cutout Pattern

Figure II.C.2

.125 X4

2.218 Dia.

.940

1.880

.940

.940

(23.88)

(23.88)

(23.88)

(3.125)

56.34

(47.75)

Analog Meter Hole Pattern

This manual is related to the following products: