beautypg.com

Initial start-up – Blodgett SBC-E Series User Manual

Page 9

background image

OM-SBC-E 7

Initial Start-Up

After the boilerless steamer has been installed, test it to ensure that the unit is

operating correctly.

1. Remove all literature and packing materials from the interior and exterior of the

unit.

2. Make sure the water supply line is open.

3. Turn on electrical service to the unit. The steamer will not operate without

electrical power. Do not attempt to operate the unit during a power failure.

NOTE: The door MUST be closed for the elements to operate.

4. To turn unit on, press the ON switch on the control panel.

5. When the steam generating reservoir has filled with water, the heaters will begin

heating automatically. Within 20 minutes or less the READY light will come on,

indicating that the water has reached its standby temperature. When the READY

light is displayed, you may take any one of the following steps:

a. Push TIMED and set the timer knob to the desired steaming time.

b. Push MANUAL for continuous steaming.

c. Push STOP to let the unit stay at ready condition.

6. To shut down the unit, press the OFF switch. The steam generating reservoir will

then fill with cold water and drain.

7. If the steamer operates as described, the unit is functioning correctly and ready

for use.

WARNING

WHEN YOU OPEN THE DOOR, STAY AWAY
FROM STEAM COMING OUT OF THE UNIT.

STEAM CAN CAUSE BURNS.