AT-3714F and AT-3726 Installation Guide

2-3

Preparing the Site

Make sure that you follow common sense installation site
requirements and observe the following:

Make sure that the switch’s power is accessible and cables can
be connected easily.

Cabling should be away from sources of electrical noise such
as radios, transmitters, broadband amplifiers, power lines, and
fluorescent fixtures.

Air flow around the switch and through its vents in the side
and rear cannot be restricted.

If you are desk mounting the switch, make sure the switch is
placed on a level, secure desktop.

Do not place objects on top of the switch.

Do not expose the switch to moisture or water.

Make sure it is in a dust-free environment.

Use dedicated power circuits or power conditioners to supply
power to the network devices.