Chapter 3, Required tools and supplies, Tools – Allied Telesis AT-iMG6x6MOD Electronics Unit User Manual
Page 11: Additional supplies, Check package contents, Installing the gateway in the enclosure, Required tools and supplies check package contents, Chapter 3 of th

AT-iMG646MOD Installation Guide
Chapter 3: Installing the Gateway in the Enclosure
11
Chapter 3
Installing the Gateway in the
Enclosure
This chapter describes how to install the gateway in the enclosure and assumes you have already installed the
enclosure. Refer to the (Enclosure installation Guide)
Required Tools and Supplies
The following tools and supplies are required to install the gateway:
Tools
Have the following tools on hand before you install the enclosure or gateway:
Flat head and #2 Phillips screwdrivers
Wire cutters
5/32 in. hex-pin security screwdriver
Additional Supplies
You may also need the following supplies:
Silicone sealant
Two UV-rated wire ties
Console cable
Power cable (AT-iMG646MOD-C01) - or customer built
Power supply (AT-iMG005G, AT-iMG006G)
Fiber cleaning materials (see Appendix B, “Cleaning Fiber Optic Connectors” on page 39)
Check Package Contents
The following items are included in the electronics package. If any item is missing or damaged, contact your
Allied Telesis representative for assistance.