beautypg.com

List of figures – Allied Telesis FS970M Series User Manual

Page 7

background image

7

Figure 1: Front Panels of the 8-port FS970M Switches........................................................................................................ 20
Figure 2: Networking Ports and SFP Slots on the 8-port Switches ...................................................................................... 20
Figure 3: Front Panels of the 24 and 48-port Switches ........................................................................................................ 22
Figure 4: Networking Ports and SFP Slots on the 24 and 48-port Switches ........................................................................ 23
Figure 5: Front Panel of the AT-FS970M/16F8-LC Fiber Optic Switch ................................................................................ 25
Figure 6: Front Panel of the AT-FS970M/16F8-SC Fiber Optic Switch ................................................................................ 25
Figure 7: Front Panel of the AT-FS970M/24F Fiber Optic Switch ........................................................................................ 26
Figure 8: Back Panels of the Single Power Supply Switches ............................................................................................... 28
Figure 9: Back Panel of the Dual Power Supply Switches ................................................................................................... 29
Figure 10: FS970M Series Management Panels.................................................................................................................. 30
Figure 11: Model Naming Conventions for the Twisted Pair Switches ................................................................................. 31
Figure 12: Model Naming Conventions of the Fiber Optic Switch ........................................................................................ 31
Figure 13: 10/100Base-TX Port LEDs .................................................................................................................................. 44
Figure 14: 10/100/1000Base-T Port LEDs............................................................................................................................ 45
Figure 15: 100Base-FX Port LED ......................................................................................................................................... 46
Figure 16: SFP Slot LEDs .................................................................................................................................................... 47
Figure 17: System LED ........................................................................................................................................................ 48
Figure 18: Components of the AT-FS970M/8, AT-FS970M/8PS, AT-FS970M/8PS-E, and AT-FS970M/24C Switches ..... 59
Figure 19: Components of the AT-FS970M/24PS, AT-FS970M/24F, AT-FS970M/48PS, AT-FS970M/16F8-LC, and
AT-FS970M/16F8-SC Switches............................................................................................................................................ 60
Figure 20: Components of the AT-FS970M/24LPS and AT-FS970M/48 Switches .............................................................. 61
Figure 21: Turning the Switch Upside Down ........................................................................................................................ 65
Figure 22: Removing the Rubber Feet ................................................................................................................................. 65
Figure 23: Attaching the Equipment Rack Brackets ............................................................................................................. 66
Figure 24: Attaching the Equipment Rack Brackets (Continued) ......................................................................................... 67
Figure 25: Attaching the Equipment Rack Brackets ............................................................................................................. 68
Figure 26: Attaching the Equipment Rack Brackets (Continued) ......................................................................................... 69
Figure 27: Mounting the Switch in an Equipment Rack ........................................................................................................ 69
Figure 28: Removing the Dust Plug from an SFP Slot ......................................................................................................... 75
Figure 29: Installing an SFP Transceiver.............................................................................................................................. 75
Figure 30: Removing the Dust Cover from the SFP Module ................................................................................................ 76
Figure 31: Positioning the SFP Handle in the Upright Position ............................................................................................76
Figure 32: Connecting the Fiber Optic Cable to the SFP Module......................................................................................... 77
Figure 33: Plugging in the AC Power Cord........................................................................................................................... 80
Figure 34: Switch Initialization Messages............................................................................................................................. 82
Figure 35: Switch Initialization Messages (Continued) ......................................................................................................... 83
Figure 36: Switch Initialization Messages (Continued) ......................................................................................................... 84
Figure 37: Connecting the Management Cable to the Console Port .................................................................................... 88
Figure 38: AlliedWare Plus Command Line Prompt ............................................................................................................. 89
Figure 39: PORT Parameter in the Command Line Interface............................................................................................... 91
Figure 40: RJ-45 Socket Pin Layout (Front View) ..............................................................................................................102

List of Figures