beautypg.com

Tools and materials needed, Using the label sheet, Cable connector codes – DAVIS Gro/Energy/Health Installation User Manual

Page 2

background image

System Installation

Page 2

Standard System Installation Manual

Two Cable Ties

Four Adhesive Pads

Two Cable Label Sheets

T

OOLS

AND

M

ATERIALS

N

EEDED

In addition to the components listed above, you may need some of the follow-
ing tools and materials. Please be sure you have everything you need before
beginning the installation.

Medium-sized Phillips Screwdriver

9-volt Alkaline Battery

Drill with #36 (.106" or 2.5 mm) and #29 (.136" or 3.5 mm) drill bits

Standard Switch Box (if you wish to mount the console on a wall with the wires
running inside the wall)

U

SING

THE

L

ABEL

S

HEET

We have provided two sheets of labels which should aid you in your installa-
tion. The majority of the labels on the sheets are cable labels for marking the
ends of each cable. These labels contain connector codes which will help you
attach the correct cable to the correct connector. We have included two label
sheets so you can label both ends of each cable with the same label.

Note:

Also included on the label sheet are circuit board labels which are for use only with industrial

versions of the stations.

Cable Connector Codes

To simplify installation, we have coded each connector and included the code
on the cable label and on the circuit board or enclosure next to the appropriate
connector. Most connector codes includes a letter and a number. The letter
identifies the module or unit on which the connector is located while the num-
ber identifies the specific connector. The following letter codes identify the
module/unit on which a connector is located.

S = Sensor Interface Module

P = Power

C = Console

L = WeatherLink

B = Battery and Solar Power

A = Alarm Output Module

PC = Computer