Gps 1000 plus, Ag leader technology – Ag Leader GPS 1000 Plus to GreenStar Installation User Manual
Page 5

GPS 1000 Plus
Installation on GreenStar™ Monitors
Ag Leader Technology
December 2003
2005638
5
8.
Hook-up appropriate power connection.
9.
Run antenna end of cable to appropriate locations and tie down where
necessary.
10.
Verify operation on monitor's GPS display.
Step-by-Step
Procedure for
Silver Wedge-
Box Mobile
Processor.
1.
Locate wire bundle coming out of Silver Processor and expose wires.
2.
Find wire labeled "CC967" (wire should be orange) and install splice
connector 4 inches from processor.
3.
Find wire labeled "CC20" (wire should be black)and install splice connector 6
inches from processor.
4.
Using adapter cable P.N. 2000998, connect terminal on blue wire to splice on
orange wire labeled "CC967".
5.
Connect terminal on black wire to splice on black wire labeled "CC20".
6.
Tuck blue and black wire's back into the corrugation of original harness.
Have the 9 pin connector come out near the processor. Replace cable ties as
necessary.
7.
Connect 9 pin D-Sub connectors of P.N. 2000998 and P.N. 3000475 or
3000476.
8.
Hook-up appropriate power connection.
9.
Run antenna end of cable to appropriate locations and tie down where
necessary.
10.
Verify operation on monitor's GPS display.