beautypg.com

HP ProLiant DL360 G5 Server User Manual

Page 60

background image

Hardware options installation 60

CAUTION: When routing cables, always be sure that the cables are not in a position where they can be

pinched or crimped.

7.

Install fan modules 1 and 2 ("

Remove and install a fan module

" on page

22

).

8.

Install the air baffle.

9.

Install the access panel (on page

20

).

10.

Slide the server into the rack.

11.

Power up the server (on page

18

).

Using a PCI SAS or SATA array controller to support six hard drives

1.

Power down the server (on page

18

).

2.

Extend the server from the rack (on page

19

).

3.

Remove the access panel (on page

20

).

4.

Remove the air baffle. ("

Remove the power supply air baffle

" on page

21

, "

Remove the processor

air baffle

" on page

22

)

5.

Remove fan modules 1 and 2 ("

Remove and install a fan module

" on page

22

).

6.

Disconnect all cables from the currently-installed HP Smart Array E200i Controller or HP Smart Array
P400i Controller.