HP ProLiant DL360 G5 Server User Manual
Page 29
Setup 29
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
the rack brackets.
Use the following information when connecting peripheral cables and power cords to the server.
WARNING: This server is very heavy. To reduce the risk of personal injury or damage to
the equipment:
•
Observe local occupational health and safety requirements and guidelines for manual
material handling.
•
Get help to lift and stabilize the product during installation or removal, especially
when the product is not fastened to the rails. When the server weighs more than 22.5
kg (50 lb), at least two people must lift the server into the rack together. A third
person may be required to help align the server if the server is installed higher than
chest level.
•
Use caution when installing the server in or removing the server from the rack; it is
unstable when not fastened to the rails.
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install
the heaviest item first, and continue to populate the rack from the bottom to the top.
1.
Install the server and cable management arm into the rack. Refer to the installation instructions that
ship with the HP 1U Quick Deploy Rail System.
2.
Connect the peripheral devices to the server.
Item Description
1
PCI Express expansion slot 1, low-profile, half-length
2
PCI Express expansion slot 2
3
Power supply bay 2
4
Power supply bay 1
5
NIC 2 connector
6
NIC 1 connector
7 Keyboard
connector
8 Mouse
connector
9 Video
connector