Installing the mini-sas p830 cable in a 2u node – HP ProLiant SL210t Gen8 Server User Manual
Page 53

Hardware options installation 53
9.
Route the cable through the air baffle, and then connect the cable to the connector on the adapter
board.
10.
Install the 2U adapter board bracket (on page
11.
Install the PCI riser cage (on page
12.
Install the node into the chassis ("
Installing a node into the chassis
" on page
13.
Connect all peripheral cables to the node.
14.
Power up the node ("
" on page
Installing the Mini-SAS P830 cable in a 2U node
1.
2.
Disconnect all peripheral cables.
3.
Remove the node from the chassis (on page
4.
Remove the PCI riser cage (on page
5.
Remove the 2U adapter board bracket (on page
6.
Disconnect and remove the Mini-SAS cable ("
" on page
7.
If not installed, install a P830 Smart Array controller into the PCI riser cage ("
" on page
8.
Connect the Mini-SAS Y-cables:
a.
Connect the Mini-SAS Y-cable x8 connectors to the P830 Smart Array controller.
b.
Route the right-angle cable through the air baffle, and then connect the two ends of the cable to the
corresponding connectors on the bottom adapter board.
c.