Operations, Power up the nodes, Power down the node – HP ProLiant SL210t Gen8 Server User Manual
Page 17: Remove the node from the chassis

Operations 17
Operations
Power up the nodes
The SL Chassis Firmware initiates an automatic power-up sequence when the nodes are installed. If the
default setting is changed, use one of the following methods to power up each node:
•
Use a virtual power button selection through iLO.
•
Press and release the Power On/Standby button.
When the node goes from the standby mode to the full power mode, the node power LED changes from
amber to green.
For more information about iLO, see the HP website
Power down the node
Before powering down the node for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the node is in standby mode, auxiliary power is still being provided to the
system.
To power down the node, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the node enters standby
mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the node to enter
standby mode.
This method forces the node to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the node enters
standby mode.
Before proceeding, verify the node is in standby mode by observing that the system power LED is amber.
Remove the node from the chassis
CAUTION:
To avoid damage to the node, always support the bottom of the node when removing
it from the chassis.
1.
2.
Disconnect all peripheral cables from the node.