Tower-to-rack conversion kit option – HP ProLiant ML370 G6 Server User Manual

Page 89

background image

Hardware options installation 89

12.

If removed, install the BBWC battery pack or the FBWC capacitor pack ("

Installing the BBWC battery

pack or the FBWC capacitor pack

" on page

86

).

13.

Install fan 5.

14.

Install the access panel.

15.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

16.

Power up the server (on page

22

, "

Powering up and configuring the server

" on page

40

).

Tower-to-rack conversion kit option

The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a rack
model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:

Rack-mounting hardware kit

Rack bezel

Front video connector cable

T-15 screws (6)

Screwlocks (2)

This document

In addition to the items supplied in the conversion kit, you will also need the following items:

A Torx T-15 screwdriver (clipped to the rear panel of the server)

A 3/16-in nut driver

To convert a tower model server to a rack model server:

1.

Power down the server (on page

22

).

2.

Disconnect all rear panel cabling.